消防安全管理人考试模拟题库

更新时间:2024-05-16 21:20:01 阅读量: 综合文库 文档下载

说明:文章内容仅供预览,部分内容可能不全。下载后的文档,内容与下面显示的完全一致。下载之前请确认下面内容是否您想要的,是否完整无缺。

Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. --Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. --Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. --Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two \ent system\s, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two \system\nt. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and other1.进行电焊、气焊等具有火灾危险作业的人员和自动消防系统的操作人员,必须

( A ),并严格遵守消防安全操作规程。

A、持证上岗 B、经过培训 C、具有相应学历

2.依法应当经公安机关消防机构进行消防设计审核的建设工程,未经依法审核或

者审核不合格,擅自施工的,责令停止施工并处( A )罚款。

A、三万元以上三十万元以下 B、三十万元以下 C、三万元以上二十万元以下

3.根据《中华人民共和国消防法》有关规定, 机关、团体、企业、事业单位应当履行下列哪些消防安全职责。( A) 1.制定消防安全制度及操作规程

2. 实行防火安全责任制,确定各级消防安全责任人 3. 组织开展消防宣传教育和防火检查

4.保障疏散通道、安全出口畅通 5.按照国家有关规定配置消防设施和器材,并确保完好、有效 A.1 2 3 4 5 B.1 2 3 4 C.2 3 4 5 D.1 2

4.下列哪个说法是正确的 B

A 设置防火分区的目的是为了防止火势向其他建筑物蔓延 B 必须在防火墙上开孔时,应采用甲级防火窗或甲级防火门 C 地下室不必划分防火分区

D 防火分区面积可以根据建筑实际情况适当扩大

5.指使或者强令他人违反消防安全规定,冒险作业的,尚不构成犯罪的,处(C )拘留。

A、五日以下 B、七日以下 C、十日以上十五日以下u

6.常用灭火器(像干粉、泡沫、二氧化碳)对D类物质火灾是否效 无 7.消防责任事故罪是指违反 ( A ) ,经消防监督机构通知采取改正措施而拒绝执行,造成严重后果的行为。 A、消防管理法规 B、消防法规 C、部门规章 D、中华人民共和国消防法

ctivities, comprehensive and tamping Safety Foundation ... Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemstry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. --Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. \Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies\on the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named \na power information technology benchmarking enterprises.\nd maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizingwork procedures, checking and inspection project. Deepening the BFS++ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to \he economic benefits of improving, outreachDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. --Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. --Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. --Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two \ent system\s, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two \system\nt. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and other8.疏散指示标志应设在疏散走道,楼梯通道转角处,不高于(C)米 A 0.5 B 0.8 C 1 D 1.2

10.下列气体其中 ( B ) 是助燃气体 A、一氧化碳 B、氧气 C、二氧化氮 D、氢气

11.二氧化碳灭火剂的主要灭火机理是 。( C ) A、冷却 B、隔离

C、窒息和冷却 D、破坏和抑制链反应

12.适用于楼梯间和单元式住宅内向公共楼梯间的分户门应采用( B )。 A 甲级防火门 B 乙级防火门 C 丙级防火门 A 甲级防火门 B 乙级防火门 C 丙级防火门

13.下列不属于消防安全重点单位的管理措施的是: C

A 实行每日防火巡查,并建立巡查记录 B 制定消防安全制度、消防安全操作规程 C 制定灭火和应急疏散预案,不需要组织消防演练 D 对职工进行消防安全培训 14.下列哪些物质可作为燃烧反应的氧化剂( B ) A、氢、氧、氯 B、氧、氯酸钾、氯 C、氧、氟、氮 D、氢、氧、氮

15.装饰材料燃烧性能等级可分为:( C )。 ①不燃性 ②难燃性 ③可燃性 ④易燃性

A ②③④ B ①③④ C ①②③④ D ①②③

16.防火卷帘设置部位一般有 1、 消防电梯前室 2、 自动扶梯周围 3、 中庭与每层走道、过厅、房间相通的开口部位 4、 代替防火墙需要设置防火分隔设施的部位 D

A 1,2,3 B 2,3,4 C 1,3,4 D1,2,3,4

17.建筑物按建筑结构划分可分为( A ) ①木结构 ②砖木结构 ③砖混结构 ④钢筋混凝土结构 ⑤钢与钢筋混凝土结构 ⑥钢结构 A ①②③④⑤⑥ B①②③④⑥

ctivities, comprehensive and tamping Safety Foundation ... Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. --Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. \Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies\, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named \na power information technology benchmarking enterprises.\nd maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS++ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to \he economic benefits of improving, outreachDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. --Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. --Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. --Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two \ent system\s, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two \system\nt. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and otherC ①③④⑤⑥ D①②③④⑤

18.生产、储存易燃易爆危险物品的大型企业应当建立 。( B ) A.民办消防队 B.专职消防队 C.公安消防队 D.专业消防队

20.违反《消防法》的规定,擅自降低消防技术标准施工的,( D ),并处一万元以上十万元以下罚款。

A. 警告或罚款5000元以上5万元以下 B. 拘留 C. 有期徒刑 D. 责令改正或者停止施工

21.行政处罚必须符合那些一定的条件( C) 1、主体要合法 2、公民、法人或者其他组织实施了违法行为 3、被处罚实施违法行为时主观上有故意或过失的过错 4、必须在法律、法规、规章规定的处罚种类、幅度之内实施 5、程序要合法 A、1234 B、12 C、12345 D、2345 E、234

22.消防工作实行( B )的原则。 1、政府统一领导 2、部门依法监管 3、单位全面负责 4、公民积极参与 A、123 B、1234 C、12 D、234

23.下列哪个表述正确 C

A 防烟分区可根据单位情况随意划分 B 挡烟垂壁可以采用难燃材料

C 防烟分区可以有效的控制烟气在室内蔓延 D 在空间较小的场所也必须设置防烟分区

24.我国消防工作贯彻 的方针。( B ) A.以防为主,防消结合 B.预防为主,防消结合 C.专门机关与群众相结合 D.以防为主,以消为辅

25.用水等灭火剂降低燃烧区的温度,当其低于可燃物的燃点时,燃烧就会停止。这属于哪一种灭火方法。( C) A.隔离法 B.窒息法 C. 冷却法 D. 抑制法

26.建筑工程施工现场的消防安全由( C )负责。 A、建设单位 B、设计单位

ctivities, comprehensive and tamping Safety Foundation ... Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. --Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. \Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies\, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named \na power information technology benchmarking enterprises.\nd maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS++ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to \he economic benefits of improving, outreachDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. --Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. --Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. --Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two \ent system\s, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two \system\nt. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and otherC、施工单位 D、工程监理单位

27.1988年1月16日国务院发布的《森林防火条例》是( B) A、法律 B、行政法规 C、部门规章 D、地方性法规

28.任何单位、个人都应当无偿为报警提供便利,不得( C)。 A、乱收费 B、见利忘义 C、阻拦报警

29.扑救初起火灾的组织程序和要点包括: 1、及时报警 2、及时组织扑救和疏散 3、及时组织安全警戒 4、指挥权的移交 D A 1,2,3 B 1,3,4 C 2,3,4 D 1,2,3,4 30.下列哪个做法是错误的(B )。

A 某单位将走道上的乙级防火门更换为甲级防火门 B 某单位在防火墙上开设排气口 C 某医院在安全出口门上开设甲级防火窗 D 某单位在经过申报同意后,在防火墙上开设一个甲级防火窗

31.《消防法》规定,电器产品、燃气用具的产品标准,应当符合( C)。 A、国家标准或者行业标准 B、安全规定 C、消防安全的要求

32.工厂的总控制室,应按照(A)配置灭火器 A 严重危险等级 B 中危险等级 C 轻危险等级

33.依法应当进行消防验收的建设工程,未经消防验收或消防验收不合格的 B A、可以边使用边申报消防验收 B、禁止投入使用 C、停止使用

34.单位消防设施、器材或者消防安全标志的配置、设置不符合国家标准、行业标准,或者未保持完好有效的,责令改正,处(B)罚款。 五千以上五万以下 35.热传播的途径有 1、热传导 3、热对流 4、热辐射

36.单位应定期检查室内消火栓是否完好,箱门,卷盘,水带,水枪是否损坏等 对 37.动火作业根据作业区域火灾危险性的大小分为一级、二级、三级等三个级别( 错)

ctivities, comprehensive and tamping Safety Foundation ... Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. --Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. \Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies\, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named \na power information technology benchmarking enterprises.\nd maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS++ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to \he economic benefits of improving, outreachDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. --Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. --Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. --Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two \ent system\s, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two \system\nt. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and other38.根据公安部61号令有关规定,单位的专职或者兼职的消防管理人员,并应当接受消防安全专门培训 对

39.多次爆炸是粉尘爆炸的最大特点。(对)

40.氧化剂是一种能氧化其他物质而本身却被还原的物质?( 对) 41.汽油引起的火灾属于B类火灾 对

42.防火门按开启方式可分为:平开门、推开门和下滑门。 对

43.火灾隐患是指违反消防法律、法规,有可能造成火灾危害的隐藏的祸患。 对 44.消防车前往执行火灾扑救任务时,不受行驶速度、行驶路线、行驶方向和指挥信号的限制,其他车辆、船舶以及行人必须让行,不得穿插、超越。(对)

45.公安机关消防机构统一组织和指挥火灾现场扑救,应当优先保障遇险人员的生命安全。(对 )

46.防火门按耐火极限分为:甲级(≥1.2h),乙级(≥0.9h),丙级(≥0.6h)。 (错)

47.建筑材料燃烧性能分级分为,A不燃性建筑材料,B1难燃性建筑材料,B2 可燃性建筑材料,B3易燃性建筑材料。 ( 对)

48.公众聚集场所未经消防安全检查或者经检查不符合消防安全要求的,可以投入使用、营业。 错

49.热量通过直接接触的物体,从温度较高部位传递到温度较低部位的过程,叫做热传导 对

50.依法应当进行消防验收的建设工程,未经消防验收或者消防验收不合格,擅自投入使用的,处五万元以上三十万元以下罚款。(错 ) 模拟题库2

3.根据《中华人民共和国消防法》有关规定, 机关、团体、企业、事业单位应当履行下列哪些消防安全职责。( A ) 1. 制定消防安全制度及操作规程 2. 实行防火安全责任制,确定各级消防安全责任人 3. 组织开展消防宣传教育和防火检查 4. 保障疏散通道、安全出口畅通 5.按照国家有关规定配置消防设施和器材,并确保完好、有效

A.1 2 3 4 5 B.1 2 3 4 C.2 3 4 5 D.1 2

4.下列哪个说法是正确的 B

A 设置防火分区的目的是为了防止火势向其他建筑物蔓延 B 必须在防火墙上开孔时,应采用甲级防火窗或甲级防火门 C 地下室不必划分防火分区 D 防火分区面积可以根据建筑实际情况适当扩大

7.消防责任事故罪是指违反 ( A ) ,经消防监督机构通知采取改正措施而拒绝执行,造成严重后果的行为。

ctivities, comprehensive and tamping Safety Foundation ... Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. --Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. \Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies\, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named \na power information technology benchmarking enterprises.\nd maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS++ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to \he economic benefits of improving, outreach

Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. --Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. --Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. --Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two \ent system\s, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two \system\nt. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and otherA、消防管理法规 B、消防法规 C、部门规章 D、中华人民共和国消防法

16.防火卷帘设置部位一般有 1、 消防电梯前室 2、 自动扶梯周围 3、 中庭与每层走道、过厅、房间相通的开口部位 4、 代替防火墙需要设置防火分隔设施的部位 D

A 1,2,3 B 2,3,4 C 1,3,4 D1,2,3,4

17.建筑物按建筑结构划分可分为(A ) ①木结构 ②砖木结构 ③砖混结构 ④钢筋混凝土结构 ⑤钢与钢筋混凝土结构 ⑥钢结构 A ①②③④⑤⑥ B①②③④⑥ C ①③④⑤⑥ D①②③④⑤

21.行政处罚必须符合那些一定的条件(C ) 1、主体要合法 2、公民、法人或者其他组织实施了违法行为 3、被处罚实施违法行为时主观上有故意或过失的过错 4、必须在法律、法规、规章规定的处罚种类、幅度之内实施 5、程序要合法 A、1234 B、12 C、12345 D、2345 E、234

29.扑救初起火灾的组织程序和要点包括: 1、及时报警 2、及时组织扑救和疏散 3、及时组织安全警戒 4、指挥权的移交 D A 1,2,3 B 1,3,4 C 2,3,4 D 1,2,3,4

30.下列哪个做法是错误的( B )。

34.单位消防设施、器材或者消防安全标志的配置、设置不符合国家标准、行业标准,或者未保持完好有效的,责令改正,处(B)罚款。 A、五千元以下 B、五千元以上五万元以下 C、五千元以上三万元以下

37.动火作业根据作业区域火灾危险性的大小分为一级、二级、三级等三个级别( 错)

38.根据公安部61号令有关规定,单位的专职或者兼职的消防管理人员,并应当接受消防安全专门培训 对

43.火灾隐患是指违反消防法律、法规,有可能造成火灾危害的隐藏的祸患。 对 44.消防车前往执行火灾扑救任务时,不受行驶速度、行驶路线、行驶方向和指挥信号的限制,其他车辆、船舶以及行人必须让行,不得穿插、超越。(对)

ctivities, comprehensive and tamping Safety Foundation ... Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. --Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. \Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies\, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named \na power information technology benchmarking enterprises.\nd maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS++ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to \he economic benefits of improving, outreachDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. --Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. --Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. --Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two \ent system\s, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two \system\nt. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and other45.公安机关消防机构统一组织和指挥火灾现场扑救,应当优先保障遇险人员的生命安全。(对 )

46.防火门按耐火极限分为:甲级(≥1.2h),乙级(≥0.9h),丙级(≥0.6h)。 (错)

47.建筑材料燃烧性能分级分为,A不燃性建筑材料,B1难燃性建筑材料,B2 可燃性建筑材料,B3易燃性建筑材料。 ( 对)

48.公众聚集场所未经消防安全检查或者经检查不符合消防安全要求的,可以投入使用、营业。 错

49.热量通过直接接触的物体,从温度较高部位传递到温度较低部位的过程,叫做热传导 对

50.依法应当进行消防验收的建设工程,未经消防验收或者消防验收不合格,擅自投入使用的,处五万元以上三十万元以下罚款。(错) 模拟题库3

2.一个灭火器配置场所计算单元内的灭火器配置的数量不应小于(B)个 A 1 B 2 C 3 D 4

4.扑救初起火灾的组织程序和要点包括: 1、及时报警 2、及时组织扑救和疏散 3、及时组织安全警戒 4、指挥权的移交 D A 1,2,3 B 1,3,4 C 2,3,4 D 1,2,3,4 7.下列哪个做法是错误的( B)。

A 某单位将走道上的乙级防火门更换为甲级防火门 B 某单位在防火墙上开设排气口 C 某医院在安全出口门上开设甲级防火窗 D 某单位在经过申报同意后,在防火墙上开设一个甲级防火窗 10.燃烧按其形成的条件和瞬间发生的特点主要分为 (D) 种类型。 A.两 B.三 C.四 D.五

11.建筑物按建筑结构划分可分为(A ) ①木结构 ②砖木结构 ③砖混结构 ④钢筋混凝土结构 ⑤钢与钢筋混凝土结构 ⑥钢结构 A ①②③④⑤⑥ B①②③④⑥ C ①③④⑤⑥ D①②③④⑤

12.消防安全重点单位的消防工作职责包括: 1、建立防火档案,确定消防安全重点部位,设置防火标志,实行严格管理; 2、实行每日防火巡查,并建立巡查记录; 3、

ctivities, comprehensive and tamping Safety Foundation ... Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. --Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. \Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies\, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named \na power information technology benchmarking enterprises.\nd maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS++ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to \he economic benefits of improving, outreachDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. --Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. --Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. --Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two \ent system\s, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two \system\nt. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and other对职工进行消防安全培训; 4、制定灭火和应急疏散预案,定期组织消防演练; 5、建立专职或义务消防队伍,加强管理、教育、培训,增强企业的自防自救能力 D A 1,2,3,4 B 2,3,4,5 C 1,3,4,5 D 1,2,3,4,5

13.根据《中华人民共和国消防法》有关规定, 机关、团体、企业、事业单位应当履行下列哪些消防安全职责。(A ) 1. 制定消防安全制度及操作规程 2. 实行防火安全责任制,确定各级消防安全责任人 3. 组织开展消防宣传教育和防火检查 4. 保障疏散通道、安全出口畅通 5.按照国家有关规定配置消防设施和器材,并确保完好、有效

A.1 2 3 4 5 B.1 2 3 4 C.2 3 4 5 D.1 2

14.下列哪些做法是错误的 1、发现通道上的门上了锁,立即报告领导 2、在生产甲醛的车间抽烟 3、立即搬走堆放在疏散通道上的杂物 4、停电时,使用蜡烛照明 B A 1,3,4 B 1,2,4 C 2,3,4 D 1,2,3

17.下列不属于消防安全重点单位的管理措施的是: C

A 实行每日防火巡查,并建立巡查记录 B 制定消防安全制度、消防安全操作规程 C 制定灭火和应急疏散预案,不需要组织消防演练 D 对职工进行消防安全培训 18.消防重点单位对每名员工应当至少 ( C) 进行一次消防安全培训。 A、每半年 B、每两年 C、每年 D、每三年

19.住宅区的(C )应当对管理区域内的共用消防设施进行维护管理,提供消防安全防范服务。

A、物业管理处 B、保卫人员 C、物业服务企业 D、各居民户

21.单位消防设施、器材或者消防安全标志的配置、设置不符合国家标准、行业标准,或者未保持完好有效的,责令改正,处(B)罚款。 A、五千元以下 B、五千元以上五万元以下 C、五千元以上三万元以下 22.下列那个做法不正确 C

A 某公司将乙类物品单独存放在甲类仓库中 B 某企业向有关部门申报经同意后改变了建筑使用性质 C 某厂房在靠近疏散通道处搭建临时员工宿舍 D 某单位一直对单位周围的消火栓进行保养

ctivities, comprehensive and tamping Safety Foundation ... Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. --Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. \Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies\, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named \na power information technology benchmarking enterprises.\nd maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS++ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to \he economic benefits of improving, outreachDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. --Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. --Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. --Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two \ent system\s, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two \system\nt. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and other24.建设单位要求建筑设计单位或者建筑施工企业降低消防技术标准设计、施工的,责令改正或者停止施工,并处(C)罚款。 A、一万元以下 B、十万元以下 C、一万元以上十万元以下

27.某饭店员工李某因下班时忘记关电器而引起火灾,造成人员伤亡和30多万元的经济损失,李某已构成 ( B)。 A、放火罪 B、失火罪

C、消防责任事故罪 D、重大责任事故罪 29.下列对于疏散走道的叙述正确的是 (A )

①疏散走道的门应该是防火门②疏散走道的吊顶应用耐火极限不低于0.25小时的非燃烧材料装修。③疏散走道不宜过长④疏散走道应宽敞明亮,尽量减少转折。⑤疏散走道不可以设门槛

A①③②④⑤ B ③②④⑤ C ①③②④ D①②④⑤

33.耐火极限不低于 (C ) 的门为乙级防火门。 A.0.6小时 B.0.9小时 C.1.0小时 D. 1.5小时

34.防火卷帘设置部位一般有 1、 消防电梯前室 2、 自动扶梯周围 3、 中庭与每层走道、过厅、房间相通的开口部位 4、 代替防火墙需要设置防火分隔设施的部位 D

A 1,2,3 B 2,3,4 C 1,3,4 D1,2,3,4

36.警告处罚是行政处罚中最轻的一种处罚,适用于情节轻微的,对社会危害程度不大的违法行为,实施警告处罚不必出具处罚裁决书。(错 ) 37.自燃分为受热燃烧和自热燃烧。(对)

38.法人单位的法定代表人或者非法人单位的主要负责人是单位的消防安全管理人。(错 )

39.遇火灾可以乘坐普通电梯逃生 错

40.参加有组织的灭火工作,是指在灭火工作中服从人民政府、消防机构或者有关人员的指挥,完成政府、消防机构或有关组织、人员交给的任务 对

41.动火作业根据作业区域火灾危险性的大小分为一级、二级、三级等三个级别(错 )

ctivities, comprehensive and tamping Safety Foundation ... Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. --Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. \Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies\, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named \na power information technology benchmarking enterprises.\nd maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS++ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to \he economic benefits of improving, outreachDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. --Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. --Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. --Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two \ent system\s, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two \system\nt. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and other42.防火墙上严禁开设门、窗、孔、洞,如必须开设,应设置甲级防火门和甲级防火窗。 对

43.干粉灭火剂主要通过在加压气体作用下喷出的粉雾与火焰接触、混合时发生的物理、化学作用灭火。 对

44.防火重点部位要“四有”,是指有防火责任人,有防火制度,有志愿消防员,有消防器材。(对)

45.火灾烟气因为温度较高,通常在室内空间上部。(对 ) 46.建筑物按使用性质可分为,民用建筑,工业建筑,农业建筑 对 47.在甲类仓库中可以同时存放性质不相抵触的甲类和乙类物质 对

48.根据公安部61号令有关规定,单位的专职或者兼职的消防管理人员,并应当接受消防安全专门培训 对

49.粉尘爆炸所需的最小点火源能量低,一般在几十毫焦耳以上,而且而表面点燃较为容易。(错)

50.高层办公楼、高层公寓等公共建筑应当按照消防安全重点单位的要求实行严格管理 对

模拟题库4

2.依法应当经公安机关消防机构进行消防设计审核的建设工程,未经依法审核或者审核不合格,擅自施工的,责令停止施工并处( A)罚款。 A、三万元以上三十万元以下 B、三十万元以下 C、三万元以上二十万元以下

3.根据《中华人民共和国消防法》有关规定, 机关、团体、企业、事业单位应当履行下列哪些消防安全职责。( A) 1. 制定消防安全制度及操作规程 2. 实行防火安全责任制,确定各级消防安全责任人 3. 组织开展消防宣传教育和防火检查 4. 保障疏散通道、安全出口畅通 5.按照国家有关规定配置消防设施和器材,并确保完好、有效 A.1 2 3 4 5 B.1 2 3 4 C.2 3 4 5 D.1 2

4.下列哪个说法是正确的 B

A 设置防火分区的目的是为了防止火势向其他建筑物蔓延 B 必须在防火墙上开孔时,应采用甲级防火窗或甲级防火门 C 地下室不必划分防火分区 D 防火分区面积可以根据建筑实际情况适当扩大

7.消防责任事故罪是指违反 (A ) ,经消防监督机构通知采取改正措施而拒绝执行,造成严重后果的行为。 A、消防管理法规 B、消防法规 C、部门规章 D、中华人民共和国消防法

ctivities, comprehensive and tamping Safety Foundation ... Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. --Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. \Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies\, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named \na power information technology benchmarking enterprises.\nd maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS++ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to \he economic benefits of improving, outreach

Delegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. --Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. --Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. --Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two \ent system\s, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two \system\nt. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and other13.下列不属于消防安全重点单位的管理措施的是: C

A 实行每日防火巡查,并建立巡查记录 B 制定消防安全制度、消防安全操作规程 C 制定灭火和应急疏散预案,不需要组织消防演练 D 对职工进行消防安全培训 15.装饰材料燃烧性能等级可分为:(C )。 ①不燃性 ②难燃性 ③可燃性 ④易燃性 A ②③④ B ①③④ C ①②③④ D ①②③

16.防火卷帘设置部位一般有 1、 消防电梯前室 2、 自动扶梯周围 3、 中庭与每层走道、过厅、房间相通的开口部位 4、 代替防火墙需要设置防火分隔设施的部位 D

A 1,2,3 B 2,3,4 C 1,3,4 D1,2,3,4

17.建筑物按建筑结构划分可分为(A ) ①木结构 ②砖木结构 ③砖混结构 ④钢筋混凝土结构 ⑤钢与钢筋混凝土结构 ⑥钢结构 A ①②③④⑤⑥ B①②③④⑥ C ①③④⑤⑥ D①②③④⑤

20.违反《消防法》的规定,擅自降低消防技术标准施工的,( D),并处一万元以上十万元以下罚款。

A. 警告或罚款5000元以上5万元以下 B. 拘留 C. 有期徒刑 D. 责令改正或者停止施工

21.行政处罚必须符合那些一定的条件( C) 1、主体要合法 2、公民、法人或者其他组织实施了违法行为 3、被处罚实施违法行为时主观上有故意或过失的过错 4、必须在法律、法规、规章规定的处罚种类、幅度之内实施 5、程序要合法 A、1234 B、12 C、12345 D、2345 E、234

29.扑救初起火灾的组织程序和要点包括: 1、及时报警 2、及时组织扑救和疏散 3、及时组织安全警戒 4、指挥权的移交 D A 1,2,3 B 1,3,4 C 2,3,4 D 1,2,3,4

35.热传播的途径有(B) 1、热传导 2、热散射 3、热对流 4、热辐射 A 1,2,3 B 1,3,4 C 1,2,3,4 D 2,3,4

ctivities, comprehensive and tamping Safety Foundation ... Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. --Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. \Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies\, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named \na power information technology benchmarking enterprises.\nd maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS++ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to \he economic benefits of improving, outreachDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. --Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. --Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. --Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two \ent system\s, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two \system\nt. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and other 37.动火作业根据作业区域火灾危险性的大小分为一级、二级、三级等三个级别(错 )

38.根据公安部61号令有关规定,单位的专职或者兼职的消防管理人员,并应当接受消防安全专门培训 (对)

40.氧化剂是一种能氧化其他物质而本身却被还原的物质?(对)

43.火灾隐患是指违反消防法律、法规,有可能造成火灾危害的隐藏的祸患。 对 46.防火门按耐火极限分为:甲级(≥1.2h),乙级(≥0.9h),丙级(≥0.6h)。 (错)

47.建筑材料燃烧性能分级分为,A不燃性建筑材料,B1难燃性建筑材料,B2 可燃性建筑材料,B3易燃性建筑材料。 (对 )

48.公众聚集场所未经消防安全检查或者经检查不符合消防安全要求的,可以投入使用、营业。 错

49.热量通过直接接触的物体,从温度较高部位传递到温度较低部位的过程,叫做热传导 对

50.依法应当进行消防验收的建设工程,未经消防验收或者消防验收不合格,擅自投入使用的,处五万元以上三十万元以下罚款。( 错 ) 模拟题库5

7.消防责任事故罪是指违反 ( A ) ,经消防监督机构通知采取改正措施而拒绝执行,造成严重后果的行为。 A、消防管理法规 B、消防法规 C、部门规章 D、中华人民共和国消防法

17.建筑物按建筑结构划分可分为(A ) ①木结构 ②砖木结构 ③砖混结构 ④钢筋混凝土结构 ⑤钢与钢筋混凝土结构 ⑥钢结构 A ①②③④⑤⑥ B①②③④⑥ C ①③④⑤⑥ D①②③④⑤

20.违反《消防法》的规定,擅自降低消防技术标准施工的,( D ),并处一万元以上十万元以下罚款。

A. 警告或罚款5000元以上5万元以下 B. 拘留 C. 有期徒刑 D. 责令改正或者停止施工

21.行政处罚必须符合那些一定的条件( C ) 1、主体要合法 2、公民、法人或者其他组织实施了违法行为 3、被处罚实施违法行为时主观上有故意或过失的过错 4、必须在法律、法规、规章规定的处罚种类、幅度之内实施 5、程序要合法 A、1234 B、12 C、12345 D、2345

ctivities, comprehensive and tamping Safety Foundation ... Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. --Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. \Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies\, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named \na power information technology benchmarking enterprises.\nd maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS++ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to \he economic benefits of improving, outreachDelegates, staff: Hello! in the run-up to the Spring Festival, we held one session of four staff representatives Conference 2013-workshop, full back in 2012, careful analysis of the current situation, discuss 2013 development plans. Here, on behalf of my company 2013 work reports to the General Assembly, for consideration. Pillar I, 2012 back in 2012, XX power companies adhere to the party's 17 great spirit for guidance, comprehensively implement the scientific concept of development, promoting cost-leadership strategy, standards, focus on implementation, lean management, continuously improve, smooth present safety situation of enterprise management, business management and control scientific and standardized, and the dedication of staff, manage a harmonious and democratic atmosphere of the good situation. Main indicators are as follows:-the battery indicator: power generation totaled 7.815 billion kWh, beyond the annual budget implementation capacity of 315 million kWh, an increase of 757 million kWh. Sales totaled 7.425 billion kWh, exceeding sales of 330 million kWh the annual Executive budget, an increase of 729 million kWh. --Security measures: unplanned outages 2.5 times. No personal injury accident occurred, no major accident and above, no major fire accidents without environmental pollution accidents, safety for three consecutive years to maintain stability to good posture. Business financial indicators: total profits of 255 million Yuan, beyond the annual budget of 207 million Yuan, beyond the Datang company index 41.89 million Yuan, an increase of 1.76 million Yuan, FCM assessment at grade four. --Energy: power supply standard coal completing 312.25 g/kWh, down 0.1 g/kWh; integrated auxiliary power consumption ratio in 5.12%, down 0.26%; pollutant emissions performance greatly reduced compared to last year, carbon 0.09 g/kWh, sulfur dioxide 0.104 g/kWh NOx 0.512 g/kWh; dust removal efficiency of more than 99.8%. --Reliability index: equivalent availability factor in 93.47%, increased 7.95% from a year earlier. Equivalent forced outage rate 0.08%, 0.16% reduction over the same period a year earlier. Major achievements: first, we should adhere to the two \ent system\s, strengthening technological research, strengthen hidden hazards control and intrinsic safety Enterprise construction took new steps. -The two \system\nt. Focus on promoting the power of the company management system and the application and implementation of the safety loop five-star management system, improve the safety management system, realize the system of safety control. Further regulate security routines, safety supervision and management network role to play to achieve closed-loop. Strengthening the supervision and management of habitual violation of, strengthening the safety supervision of outsourcing contractors. Carried out in spring and autumn of security inspections, flood control and inspection, safety production month, day supervision of production safety and the Olympic Games and otherE、234

29.扑救初起火灾的组织程序和要点包括: 1、及时报警 2、及时组织扑救和疏散 3、及时组织安全警戒 4、指挥权的移交 D A 1,2,3 B 1,3,4 C 2,3,4 D 1,2,3,4

47.建筑材料燃烧性能分级分为,A不燃性建筑材料,B1难燃性建筑材料,B2 可燃性建筑材料,B3易燃性建筑材料。 ( 对 )

48.公众聚集场所未经消防安全检查或者经检查不符合消防安全要求的,可以投入使用、营业。 错

49.热量通过直接接触的物体,从温度较高部位传递到温度较低部位的过程,叫做热传导 对

50.依法应当进行消防验收的建设工程,未经消防验收或者消防验收不合格,擅自投入使用的,处五万元以上三十万元以下罚款。(错)

ctivities, comprehensive and tamping Safety Foundation ... Troubleshooting, management mechanism, give full play to role of technical supervision and realization of troubleshooting, management, improved process management. This year completed the boiler lower header leakage, boiler pressure, a major risk management, completed 29 of great risks and 3 General problems of governance. Complete chemistry lab construction, thermal control, and complete the boiler scale integrated management, host shafting vibration of 10 scientific and technological projects, such as. Complete supercritical 630MW on-line simulation system development and application of circulating water MCC standby power transformation, the transformation of desulfurization waste water, the unit water supply system of comprehensive treatment and discharge valve modification of coal mill 5 key technological transformation projects, group health is improved. --Science and technology innovation is further increased. Strengthen the characteristics of supercritical unit major issues, gradually clearing the particularity of supercritical unit and regularity. Developed motor oil time management, switch action times, statistics, coal-aided measurement software, improves the production level of lean management. Increased investment in science and technology, reporting science and technology projects and 14 technical project total cost percentage of the total annual production output of 0.25%. \Large-scale coal-fired power plant flue gas desulfurization, denitrification complete development and application of key technologies\, won the national science and technology progress second prize. 630MW supercritical units optimized control strategies and the 630MW development and application of on-line simulation system for supercritical units, supercritical 600MW units of turbine driven boiler feed pump set of comprehensive treatment of defects Datang technology respectively one or two and third. Meanwhile, information technology achievements, the company was named \na power information technology benchmarking enterprises.\nd maintenance has improved further. Modify the inspection standards and standards on a regular basis, standardizing work procedures, checking and inspection project. Deepening the BFS++ system, and implements maintenance information shared. Reorganizing RB logic again, and ensure the success of the RB. Innovating the mechanism of maintenance management, implemented a project manager system. Successful completion of two autonomous maintenance, reliability improved steadily. Implementing two c-level maintenance, project themselves 48.7% and 42.3%, respectively. Accomplish two circulating pumps repair and overhaul of four Mills, maintenance teams to get exercise. Promote the work of energy saving and consumption reducing, complete the unit energy consumption diagnosis, plant water balance test, 10 energy-saving projects. Second, we should adhere to \he economic benefits of improving, outreach

本文来源:https://www.bwwdw.com/article/k0l7.html

Top