安全文明施工费(Safe and civilized construction cost)

更新时间:2023-05-08 07:23:01 阅读量: 实用文档 文档下载

说明:文章内容仅供预览,部分内容可能不全。下载后的文档,内容与下面显示的完全一致。下载之前请确认下面内容是否您想要的,是否完整无缺。

安全文明施工费(Safe and civilized construction cost)Forwarding the notice of the Ministry of construction on the construction safety protection, civilized construction measures, expenses and the use and management regulations

Wuhu City [2006] 208

All concerned units:

In order to strengthen the safety and civilized construction management, guarantee the construction personnel working conditions and living environment, ensure safe production and civilized construction funds in place, to prevent the occurrence of accidents in the construction, the Ministry of construction "construction safety protection, civilized construction measures and the use of cost management regulations" (build do 2005 89 No.) forwarded to you, and combined with the actual situation of our city, put forward the following opinions, please follow.

A, construction safety protection, civilized construction measures fee is in accordance with the current national construction safety, construction site environmental and health standards and the relevant provisions of the cost of the purchase and replacement of construction safety equipment and facilities, improve the conditions for safe production and operation environment needed. Please see the attached list of safety protection and civilized construction measures.

Two, according to the "Anhui province construction installation engineering cost quota" (2000), "Anhui province

construction cost valuation quota" and other regulations, Anhui province construction safety protection and civilized construction rate in Annex 2.

Three, according to Annex 2 Calculation of safety protection, civilized construction measures fee, not including the safety protection and civilized construction have special requirements and high risk project to increase the safe and civilized construction measures and scheme demonstration, review and other expenses, as well as the construction units have the other requirements of the cost of the construction of security and civilization construction measures.

In case of such expenses, it shall be calculated separately, and shall be included in the measures for safety protection and civilized construction.

Four, construction safety protection, civilized construction measures for non competitive fees, not as a factor to participate in bidding. The construction units, design units in the preparation of engineering budget (pre) is; the tender or qualified intermediary agency and the preparation of the bidding documents, the bidder in the tender documents, should be in accordance with the provisions of this notice are listed separately, separate quotation, full calculation of safety protection, civilized construction measures fee. Safety protection and civilized construction project list is not listed separately in the bidding documents, bidding supervision and management institutions are not for the record in the bidding documents for the record; in the bidding documents according to the provisions of this notice for

individual safety protection, civilized construction measures fee or take into account is insufficient, can be regarded as unreasonable price shall be nullified.

The direct contracting project shall, in accordance with the provisions of this notice and the rate standard, separately charge the building safety protection and civilized construction measures in the quotation or contract.

The cost of the project and the consulting unit shall calculate the cost of safety protection and civilized construction measures in accordance with this notice and the relevant provisions when examining the completion of the project.

Five, the construction unit shall in accordance with this notice and contract, promptly to the construction units to pay security, civilized construction measures fees. The construction units in the project a month after signing the contract within the agreed or not later than seven days before the commencement date, payment security protection, civilized construction measures fee of not less than 50% of the total cost, the remaining costs shall be paid in accordance with the construction schedule, and be clear in the contract.

Six, construction units should set up special and supervision units double control of safety protection, civilized construction measures, expenses, special funds account. The construction unit should establish a cost of safety protection, civilized construction measures of the unit measures for the use and management of special safety protection, civilized construction measures fee funds, and are listed separately in

the financial management of the safety protection, civilized construction measures fee list for reference.

Seven, safety protection, civilized construction measures, costs paid to implement the first implementation of security protection, civilized construction measures after the payment of fees. Construction units in the basic test trough, the main structure of the construction to half and after the completion of the project, three times to apply for payment of security protection and civilized construction measures. The construction units pay for safety protection, civilized construction measures in the application time, must be in accordance with the mandatory standards for construction projects and the "construction safety inspection standards" (JGJ59-99) and other provisions of the construction site safety and civilized construction acceptance, reached the standards by supervision units to examine and verify the signature confirmation, reported to the municipal construction administrative department for the record after the payment.

Eight, the construction units apply for construction permits, construction contract costs should be safety protection, civilized construction measures of the agreed payment plan and set up the construction unit of the special funds account, the first payment of the photocopy of the certificate submitted to the municipal construction and management office; not submitted, the municipal construction management department shall not issue construction permits. The completion of the project acceptance, the construction unit shall submit the safety protection and civilized construction charges to be paid the photocopy of the certificate and the project safety

civilized construction comprehensive evaluation table; not submitted to the Municipal Quality Supervision Station shall not be completed acceptance. City construction administrative departments in the construction contract, safety supervision report, issued construction permits and completion of the project acceptance, should audit strictly in accordance with the provisions of this notice, to meet the requirements, it shall be ordered to make corrections.

Nine, the construction units are not in accordance with the regulations and payment security protection, civilized construction measures fee; construction units use the safety protection, civilized construction measures in accordance with the provisions of fees or safety protection, civilized construction measures are not implemented; bidding or tendering agency is not required in the bidding documents for security protection, alone civilized construction measures fee or fee fee standards do not conform to the provisions, shall be held accountable.

Ten. No unit or individual may agree to reduce or delay the cost of safety protection and civilized construction measures.

Eleven. This notice shall come into force on November 1, 2006. Any bid invitation project or contract signing project (non bid invitation) issued after November 1, 2006 shall be carried out in accordance with this notice.

Enclosure:

1, the Ministry of construction on the issuance of

"construction safety protection, civilized construction measures, costs and the use of management regulations" notice (Jian [2005] 229)

2, Anhui province construction project safety protection and civilized construction measures tariff

Two years six, October 11th

Circular on printing and distributing the provisions on the safety measures and civilized construction measures for construction projects and the regulations for the administration of their use

Build [2005] 89

The construction offices of the provinces, autonomous regions and municipalities directly under the central government, the Construction Committee of the province, the Construction Bureau of Jiangsu province and Shandong Province, and the Construction Bureau of the Xinjiang production and construction corps:

The construction safety protection, civilized construction measures, fees and use regulations are hereby printed and issued to you. Please combine with the actual situation in this region and earnestly implement them. Carrying out relevant issues and situations in a timely manner and feedback to the Ministry of construction in a timely manner.

Ministry of construction of the People's Republic of China

(Chapter)

Two years five, June 7th

Provisions on construction safety protection, civilized construction measures, expenses and use management

Article 1 in order to strengthen the safety and civilized construction management, guarantee the construction workers working and living conditions, to prevent the occurrence of safety accidents, according to the "People's Republic of China production safety law", "People's Republic of China Construction Law", "construction safety management regulations", "safe production license regulations" and other laws and regulations. These Provisions are formulated.

Second of these Provisions apply to all types of new, expansion or reconstruction of housing construction projects (including its supporting lines, pipelines and equipment installation works, decoration works), municipal infrastructure projects and demolition projects.

Third said the safety protection, civilized construction measures fee is in accordance with the current national construction safety, construction site environmental and health standards and the relevant provisions of the cost of the purchase and replacement of construction safety equipment and facilities, improve the conditions for safe production and operation environment needed. Please see the attached list of safety protection and civilized construction measures.

If the construction unit has other requirements for the safety protection and civilized construction measures of the building project, the expenses incurred shall be included in the cost of safety protection and civilized construction measures.

The cost of safety protection and civilized construction fourth construction project is composed of "construction and installation cost of the project" (standard [2003]206) and civilized construction measures for the fee, environmental protection fees, temporary facility fee, safety construction costs.

The safety construction fee shall be composed of the safety of the temporary, entrance, crossing, height operation, safety risk, engineering safety measures and other expenses. The risk of the project, the safety measures and other expenses shall be determined by the administrative department in charge of construction in conjunction with the actual situation in the region.

Fifth construction units, design units in the preparation of engineering budget (pre) count, should be based on the corresponding rate of the location of the project construction cost management mechanism determination, reasonably determine the engineering safety protection, civilized construction measures fee.

Sixth according to the engineering project bidding, the tender or the qualified intermediary agency bidding documents, in accordance with the relevant provisions shall be listed separately and combined with the actual safety protection and

civilized construction project list.

The bidder shall according to the current standards, combined with the engineering characteristics, construction progress and operation environment, develop safety protection and civilized construction measures in the construction organization design documents, and in accordance with the requirements of the tender documents according to its construction technology level and management level of engineering safety protection and civilized construction project price alone. The bid for safety protection and civilized construction measures of the bidder shall not be less than 90% of the total cost required by the project cost management institution at the site of the project.

Article seventh construction units and construction units should be clearly defined in the construction contract safety protection, civilized construction measures, the total cost of the project, as well as the cost prepaid plan, payment plan, the use of requirements, adjustment methods and other provisions.

The construction units and construction units in the construction contract for safety protection and civilized construction costs, not prepaid payment plan agreement or the agreement is not clear, the duration of the contract within a year, the construction unit in advance safety protection and civilized construction project cost not less than the cost of 50% of the total; the contract period of more than one year (including one year), the cost of prepaid safety protection, civilized construction measures shall not be less than the cost

of 30% of the total, the remaining costs shall be paid in accordance with the construction schedule.

General contracting, general contracting unit shall be subcontracted to other construction units, the general contractor and the subcontractor shall specify the security, the sub contract in civil construction cost measures unified management by the general contracting unit. The safety protection and civilized construction measures shall be implemented by the subcontractor, and the special security measures and construction plans shall be put forward by the subcontractor, and the fees shall be paid in time after the approval of the general contractor.

Eighth construction units apply for construction permits, shall be the cost of safety protection, civilized construction measures stipulated in the construction contract payment plans as specific measures to ensure the safety of the project submitted to the administrative department in charge of construction. If it is not submitted, the construction administrative department will not issue a construction permit.

The ninth construction units shall, in accordance with these provisions and the contract, promptly pay the safety and civilized construction measures to the construction units, and urge the construction enterprises to implement safety protection and civilized construction measures.

The tenth project supervision units shall carry out on-site supervision of the construction units to implement safety

protection and civilized construction measures. For the safety protection and civilized construction measures already implemented by the construction units, the chief supervision engineer or the cost engineer shall promptly examine and sign the expenses incurred. The supervision unit construction unit is not found to implement the safety construction organization design and construction scheme of special protection and civilized construction measures, has the right to order the immediate rectification; the construction unit refused to rectification or not according to the time required to complete the rectification, the engineering supervision unit shall report to the competent department of construction units and construction administration in a timely manner, when necessary to the suspension of the construction.

Eleventh construction units should ensure that the safety protection and civilized construction measures are earmarked for funds. In the financial management, a list of safety protection and civilized construction measures is listed separately, and the list of project costs is for future reference. Safety production management of construction units and personnel responsible for safety production management of construction safety protection, civilized construction measures for the organization and implementation of on-site supervision and inspection, and has the right to reflect the situation of the Department in charge of construction.

The use of responsibility contracting units of construction engineering safety protection and civilized construction costs. The general contractor shall, in accordance with these provisions and the contract, promptly pay the Contractor's

safety, protection and civilized construction measures in accordance with the provisions of these regulations and the contract. If the general contractor fails to pay the expenses in accordance with these provisions and the contract, the subcontractor may not bear the primary responsibility for the accident if the subcontractor fails to implement the safety and protection measures in time.

Twelfth construction administrative departments shall, in accordance with the existing standards of protection, construction site safety and civilized construction measures in the implementation of supervision and inspection, and to pay the construction units and construction units to supervise the use of safety protection and civilized construction cost.

Thirteenth construction units are not paid in accordance with the provisions of safety protection, civilized construction measures fee, and above the county level administrative departments in charge of construction on the basis of the "construction safety management regulations" provisions of article fifty-fourth, ordered rectification; overdue correction, ordered the construction project to stop construction.

Fourteenth construction units of misappropriation of safety protection and civilized construction costs, by the construction administrative department at or above the county level on the basis of the "construction safety management regulations" provisions of article sixty-third, ordered rectification, at the cost of 20% more than 50% following misappropriation of fines; losses, shall be liable for

compensation.

Fifteenth construction administrative departments of the staff of one of the following acts, shall be given an administrative sanction by the unit or by higher authorities; constitute a crime, criminal responsibility shall be investigated in accordance with the relevant provisions of the criminal law:

(1) issuing construction permits for projects that fail to submit plans for the payment of safety protection and civilized construction measures;

(two) it is found that illegal acts are not investigated and dealt with;

(three) other acts that do not perform the duties of supervision and administration according to law.

Sixteenth construction projects outside the security protection, civilized construction measures, costs and the use of management may refer to the provisions of the implementation.

Seventeenth areas may, in accordance with these regulations, in accordance with the actual situation in the region to formulate rules for implementation.

Article eighteenth of the provisions of the State Council building administrative departments responsible for the interpretation.

These nineteenth regulations shall come into force on September 1, 2005.

Annex: list of items of safety protection and civilized construction measures for construction projects

List of safety protection and civilized construction measures for construction projects

Category item name specific requirements

civilization

construction

and

Environmental Science

A safety warning mark board is provided, and a safety warning sign which is in accordance with the national standard is arranged at the place where the casualty (or danger) is easily damaged

Site enclosure (1) closed enclosure at the site, the height of not less than 1.8 m;

(2) the retaining materials can be made of coloured and shaped steel plates, brick and concrete blocks, etc..

Five, a map at the entrance of the office hanging project

overview, management list and supervision telephone, safety production, civilized construction, fire protection five board; construction site master plan.

The enterprise signs, the entrance and exit of the door should be provided with the enterprise logo or enterprise logo

Field capacity profile (1) road unblocked;

(2) drainage ditch and drainage facilities are unobstructed;

(3) site hardening treatment;

(4) greening.

Material piled up (1) materials, components, materials, etc. when stacked, hang names, varieties, specifications and other signs;

(2) cement and other easy flying fine building materials should be stored in airtight or covered;

(3) classification of inflammable, explosive and poisonous and harmful substances.

The fire prevention and fire fighting equipment is reasonable and meets the fire protection requirements.

Garbage construction site should be set closed garbage station, construction waste, garbage should be classified and stored. Construction waste must be transported in corresponding

containers or pipes.

Pro

time

set up

Site office facilities (1), the construction site, office, living areas and work areas separately, to maintain a safe distance.

(2) site offices, living quarters, canteens, toilets, drinking water and resting places meet health and safety requirements.

Shi

work

present

site

Pro

time

use

The power distribution line (1) is equipped with five core cables, four core cables and three core cables according to the

requirements of the TN-S system;

(2) according to the requirements of the erection of temporary power lines, poles, porcelain, porcelain crossarm, or buried cable trench.

(3) protection facilities for insulators such as wood and plastics are provided for the external power lines near the construction site.

Distribution box switch box (1) according to the three level distribution requirements, equipped with general distribution box, distribution box, switch box three kinds of standard electric box. The switch box shall be in accordance with one machine, one box, one gate and one leak. Three types of electrical boxes in all types of electrical appliances should be qualified products;

(2) according to the requirements of the two level protection, the total power distribution box and the leakage protector in the switch box are selected according to the capacity requirements and the quality.

Earthing protection devices shall be protected from repeated earthing at least three places at the construction site.

Category item name specific requirements

security

whole

Shi

Work facing

edge

hole

mouth

hand over

fork

high

place

do

trade

Anti

Supporting floor, roof, balcony edge protection with fine mesh safety net closed, operation layer plus protective railings and skirting boards on both sides of the 18 cm high.

The channel mouth protective shelter shed, shed should be not less than 5 cm thick planks or two within 50 cm of the bamboo

fence. Both sides shall be closed along the handrail with a mesh type safety net.

The protection board for the entrance hole shall be totally enclosed; the short side is more than 1.5m long, and besides the enclosing, there shall be a protective railing around it.

The elevator door is stereotyped, wellhead tools and standardization of the protective door; every two floors in the elevator shaft (less than 10m) set up a safety net.

The stairs door 1.2m high standard tools, and standardization of the protective railing, skirting the 18 cm high.

Vertical crossing, protection, protection, isolation, shelter or other facilities.

A suspension or other device with a suspended seat belt; an operating platform; a ladder or other type of passage up and down

Others (made by Region)

Note: the construction safety protection and civilized construction measures listed in this table are determined according to the current laws, regulations and standards. If the laws, regulations and standards are revised, the items listed in this table shall be adjusted in accordance with the revised laws, regulations and standards.

Annex 1:

Notice of the Ministry of construction on printing and distributing the regulations on the safety measures and civilized construction measures for construction projects and the regulations for the administration of their use

Jian an [2005] No. 229

Municipal Construction Committee, Hefei city building management bureau:

Notice of the Ministry of construction on the issuance of "construction safety protection, civilized construction measures, fees and use management regulations" (Construction Office [2005] 89, hereinafter referred to as the provisions) forwarded to you,

At the same time, we will put forward suggestions for implementation in accordance with the actual situation of our province and implement it together.

A, construction administrative departments at all levels and all construction enterprises should attach great importance to fully understand the provisions to strengthen the safety and civilized construction management, guarantee the construction workers working and living conditions, to prevent the occurrence of accidents in the construction, the significance of building a socialist harmonious society. In accordance with the requirements, from September 1st onwards seriously implement.

Two, the construction unit in the preparation of project budget, should be based on the notice of the Ministry of construction, Ministry of Finance on Issuing the "construction and installation cost of the project is composed of the" (standard 2003 No. 206) and the corresponding rate of project cost management agencies of the provincial regulations (i.e., civilized construction, environmental protection, safe construction of temporary facilities, four the project, determine the rate) construction safety protection, civilized construction measures fee (hereinafter referred to as safe production costs).

Three, according to the law of the bidding project, bidding or tendering agent bidding documents, should also be appropriate to build the standard rates based management regulations No. 206 and 2003 institutions at the provincial level of project cost, to determine the safe production cost, the cost shall be included in the project bidding price. The non bidding project shall also determine the safety production cost in the contract in accordance with the aforesaid documents and the prescribed rates.

Four, the construction units to set up a special account for production safety costs, the construction unit in accordance with the provisions of the Ministry of construction paid, earmarking.

Five, the construction units and construction units in the construction contract should be clear about the total cost of production safety, as well as prepaid plan, payment plan, use requirements, adjustment methods and other provisions. When